About the project
- Date: August 20, 2025
- Client: CYS
- Category: Energy
- Address: -
This project involved the installation and integration of an industrial power and electrical control system designed to support stable, safe, and efficient plant operations. The scope covered power equipment installation, electrical control integration, monitoring, and system readiness for future SCADA connectivity.
Our team was responsible for planning, equipment coordination, on-site installation, wiring, testing, and commissioning of the electrical system. Special attention was given to operational safety, load stability, and compliance with industrial electrical standards.
The system was designed to ensure reliable power distribution, minimize downtime risks, and provide a strong foundation for future automation and smart monitoring upgrades.






